Български
English
БГ
EN
About us
Activities
Projects
Capacities
News
Contacts
Contacts
About us
Activities
Projects
Capacities
News
Contacts
Contacts
Portfolio Category : [:bg]Реализирани[:en]Completed[:]
Home
/ Portfolio Category /
[:bg]Реализирани[:en]Completed[:]
All
Проект: „Модернизация на тягови подстанции Враца и Перник, част от основния мрежов коридор „Ориент/Източно-Средиземноморски“
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Park planning, landscaping and improvement of the physical environment of Station Garden Park, Stara Zagora in order to achieve a sustainable urban environment
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Engineering and Construction of Central Railway Station – Sofia
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Rehabilitation of railway track from arrow No. 103 (Port of Burgas) to arrow No. 20 (Vladimir Pavlov station)
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Preparation of Technical Design and Construction of Hemus Motorway, Section from km 78+500 to km 87+800
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Rehabilitation and landscaping of walkways, bicycle lanes, recreation area and playground around National Palace of Culture – Sofia
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Engineering: design and construction of sports and entertainment complexes and facilities
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Reconstruction of Sindel distributive station – part of the project “Doubling and electrification of the railway line Karnobat-Sindel”
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Modernization of the railway section Elin Pelin – Kostenets – railway section from km 42+200 to km 62+400
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Overhaul of road II 81 Kostinbrod – Berkovitsa – Montana from km 86+289 to km 94+000 under the Interreg V-A program Romania – Bulgaria 2014-2020
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Landscaping Plot VI-7153, 326a and construction of Hr. Botev Str. by 772 to 4640, according to the plan of Stara Zagora
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Landscape improvements of the environment of Metropolitan Metodiy Kusev Park – Stara Zagora
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Electrification of the 83rd railway line Simeonovgrad – Nova Zagora
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Design, construction and commissioning of new gas pipeline section from Pravets gas pipeline deviation and optical cable line to it
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Reconstruction of a protective facility at the passage of the Transit Gas Pipeline for Greece through the Struma River to the town of Boboshevo at 175+34
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Rehabilitation of Todor Kirkov Square, Varosha Quarter, Town of Lovech
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Оverhaul and implementation of energy efficiency measures at facility – Marin Drinov Secondary School – Sofia
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Main reconstruction of the central pedestrian zone – Vidin – BG16RFOP001-1.010 “Implementation of Integrated Plans for Urban Regeneration and Development 2014-2020”
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Closure and recultivation of an old landfill for solid waste in Gradishte locality on the land of the town of Dryanovo
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Construction and installation works on a new expressway for taxiing – Sofia Airport
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Construction and commissioning of constructions to the Bulgartransgaz EAD
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Improvement of Ilinden Str. in Riltsi Village, Blagoevgrad Municipality, Stage II
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Construction of plasterboard for disposition of gypsum from sulfur-purifying installations of Maritsa – East 2 TPP EAD – Section 1
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0
Reconstruction and modernization of Bulgarian Football Union Headquarter – Sofia
[:bg]Всички[:en]All[:]
·
[:bg]Реализирани[:en]Completed[:]
0