Construction and commissioning of constructions to the Bulgartransgaz EAD gas
position 1: Main and local gas pipelines – Northern highway and their facilities: Updating and bringing the design documentation in compliance with the regulatory requirements, receiving of Permit for construction, execution of construction and assembly works and commissioning of optical cables in the section from Town of Botevgrad – crane unit Batultsi – Chiren underground gas storage.
- position 2: Main and local gas pipelines – Northern highway and their facilities: Updating and bringing the design documentation in compliance with the regulatory requirements, receiving of Permit for construction, execution of construction and assembly works and commissioning of optical cables in the section from the intermediate point of the route (IPR) crane node (CN) Batultsi – IPR CN Nikolaevo to the node GCS Pleven, with identification № 140-025.