Rehabilitation of railway track from arrow No. 103 (Port of Burgas) to arrow No. 20 (Vladimir Pavlov station)
The contract is part of the project “From East to West – 2. Access to the OIS corridor from the central port of Burgas: Rehabilitation of the railway connections to the Trans-European transport network”.
The scope of the project includes: Rehabilitation of a railway freight track including a railway track and all adjacent switches located along the freight track connecting switch #103 at the end of track #34 outside the property of Burgas East Terminal 2 and switch #20 , located in the northern part of track No. 5 of the Vladimir Pavlov railway station and contact network. Construction of an S-connection connecting the “East-West Connection” track and the “First Towing Track” at the Burgas railway station. Construction of an S-connection connecting the “East-West Connection” track and the “First Towing Track” at the Burgas railway station.
The site’s contractor is “VDH” AD. The value of the contract is BGN 4,978,974.00 excluding VAT, and the deadline is 223 days.

The financing of the contract is carried out with co-financing from the EU Cohesion Fund under the Operational Program “Transport and Transport Infrastructure” 2014-2020.

 

Office Sofia

 

Sofia
6 Tsar Osvoboditel Blvd.

 

+359 2 980 9885
+359 2 988 1780
office@vdh.bg

Office Sliven

 

Sliven
9A Gen. Dragomirov str.

 

+359 44 666 340
+359 44 666 341
office.sliven@vdh.bg