Construction and commissioning of constructions to the Bulgartransgaz EAD gas

  • position 1: Main and local gas pipelines – Northern highway and their facilities: Updating and bringing the design documentation in compliance with the regulatory requirements, receiving of Permit for construction, execution of construction and assembly works and commissioning of optical cables in the section from Town of Botevgrad – crane unit Batultsi – Chiren underground gas storage.

  • position 2: Main and local gas pipelines – Northern highway and their facilities: Updating and bringing the design documentation in compliance with the regulatory requirements, receiving of Permit for construction, execution of construction and assembly works and commissioning of optical cables in the section from the intermediate point of the route (IPR) crane node (CN) Batultsi – IPR CN Nikolaevo to the node GCS Pleven, with identification № 140-025.

 

Office Sofia

 

Sofia
6 Tsar Osvoboditel Blvd.

 

+359 2 980 9885
+359 2 988 1780
office@vdh.bg

Office Sliven

 

Sliven
9A Gen. Dragomirov str.

 

+359 44 666 340
+359 44 666 341
office.sliven@vdh.bg